Maturity Model

Averaged result of Maturity estimation for a department

 

Each axis represents the identified maturity for a single process. The remaining space represents the gap. For optimized performance, the maturity level needs to be improved.
The picture shows that levels are not strictly disconnected: an organization can meet Level 2 and Level 3 criteria at the same time.

contact us

Contact us:

procise gmbh

Hanauer Landstraße 293 B

60314 Frankfurt

Germany

 

email us

tel: +49 69 24240660